-
Nat Rev Drug Discov · Nov 2014
The Critical Path Institute: transforming competitors into collaborators.
- Martha Brumfield.
- President and CEO of the Critical Path Institute, 1730 East River Road, Tucson, Arizona 85718, USA.
- Nat Rev Drug Discov. 2014 Nov 1; 13 (11): 785-6.
AbstractThe Critical Path Institute brings scientists from regulatory agencies, industry and academia together to improve drug development and regulatory processes.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*,_underline_or**bold**. - Superscript can be denoted by
<sup>text</sup>and subscript<sub>text</sub>. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3., hyphens-or asterisks*. - Links can be included with:
[my link to pubmed](http://pubmed.com) - Images can be included with:
 - For footnotes use
[^1](This is a footnote.)inline. - Or use an inline reference
[^1]to refer to a longer footnote elseweher in the document[^1]: This is a long footnote..