• FASEB J. · Mar 2013

    Nonspecific sarcolemmal cation channels are critical for the pathogenesis of malignant hyperthermia.

    • José M Eltit, Xudong Ding, Isaac N Pessah, Paul D Allen, and José R Lopez.
    • Department of Physiology and Biophysics, Virginia Commonwealth University, Richmond, Virginia, USA.
    • FASEB J. 2013 Mar 1; 27 (3): 991-1000.

    AbstractMalignant hyperthermia (MH) susceptibility has been attributed to a leaky sarcoplasmic reticulum (SR) caused by missense mutations in RYR1 or CACNA1S, and the MH crisis has been attributed solely to massive self-sustaining release of Ca(2+) from SR stores elicited by triggering agents. Here, we show in muscle cells from MH-RyR1(R163C) knock-in mice that increased passive SR Ca(2+) leak causes an enlarged basal influx of sarcolemmal Ca(2+) that results in chronically elevated myoplasmic free Ca(2+) concentration ([Ca(2+)]i) at rest. We discovered that Gd(+3) and GsMTx-4 were more effective than BTP2 or expression of the dominant-negative Orai1(E190Q) in reducing both Ca(2+) entry and [Ca(2+)]i, implicating a non-STIM1/Orai1 SOCE pathway in resetting resting [Ca(2+)]i. Indeed, two nonselective cationic channels, TRPC3 and TRPC6, are overexpressed, and [Na]i is chronically elevated in MH-RyR1(R163C) muscle cells. [Ca(2+)]i and [Na(+)]i are persistently elevated in vivo and further increased by halothane in MH-RyR1(R163C/WT) muscle. These increases are markedly attenuated by local perfusion of Gd(+3) or GsMTx-4 and completely suppressed by dantrolene. These results contribute a new paradigm for understanding MH pathophysiology by demonstrating that nonselective sarcolemmal cation channel activity plays a critical role in causing myoplasmic Ca(2+) and Na(+) overload both at rest and during the MH crisis.-Eltit, J. M., Ding, X., Pessah, I. N., Allen, P. D., Lopez, J. R. Nonspecific sarcolemmal cation channels are critical for the pathogenesis of malignant hyperthermia.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

What will the 'Medical Journal of You' look like?

Start your free 21 day trial now.

We guarantee your privacy. Your email address will not be shared.