-
- E Duchalais, N Machairas, S R Kelley, R G Landmann, A Merchea, D T Colibaseanu, K L Mathis, E J Dozois, and D W Larson.
- Division of Colon and Rectal Surgery, Mayo Clinic, 200 First Street SW, Rochester, MN, 55905, USA.
- Surg Endosc. 2018 Aug 1; 32 (8): 3659-3666.
BackgroundSeveral studies have shown a correlation between longer operative times and higher rates of postoperative morbidity for open and laparoscopic surgery for rectal cancer. The aim of the study was to determine the impact of prolonged operative time on early postoperative morbidity in patients undergoing robotic-assisted rectal cancer resection.MethodsThe study was a retrospective review of a prospectively maintained database conducted in two centers of the same institution. A total of 260 consecutive patients undergoing with robotic-assisted resection for rectal cancer between 2007 and 2016 were included. Patients were divided into two groups regarding median operative time: > 300 min (prolonged operative time; n = 133) and ≤ 300 min (control; n = 127). Patient characteristics, operative and postoperative data were compared between groups. Univariate and multivariate analyses were performed to determine whether prolonged operative time was a predictive factor of 30-day postoperative morbidity.ResultsProlonged operative time was noted more frequently in males (p = 0.02), patients with higher BMI (p < 0.01), more severe comorbidities (p < 0.01), in tumors of the mid-rectum, and in surgery performed after neoadjuvant chemoradiation or upon surgeons' learning curve. The two groups had similar overall postoperative morbidity (32 vs. 41%; p = 0.16) and severe morbidity (6 vs. 6%; p = 0.92) rates. Prolonged operative time was associated with longer hospital stay (3.8 ± 2.5 vs. 5.0 ± 3.7 days; p = 0.004) in univariate analysis. Prolonged operative time was not independently associated with postoperative morbidity or with increased hospital stay on multivariate analysis.ConclusionIn our study, prolonged operative time was not associated with an over-risk of morbidity in patients undergoing robotic resection for rectal cancer. These results suggest that more difficult robotic procedures do not lead to increased postoperative morbidity.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.