-
- R L Woosley and J Cossman.
- The Critical Path Institute, Tucson, Arizona, USA. Rwoosley@C-Path.org
- Clin. Pharmacol. Ther. 2007 Jan 1; 81 (1): 129-33.
AbstractAdvances in biomedical research over recent decades have substantially raised expectations that the pharmaceutical industry will generate increasing numbers of safe and effective therapies. However, there are warning signs of serious limitations in the industry's ability to effectively translate biomedical research into marketed new therapies. Clinical pharmacologists should be aware of these signals and their potential impact. Here, we discuss a strategy, where clinical pharmacology can play an important role to improve the process of drug development.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.