• Disaster Med Public Health Prep · Jun 2010

    Impact on hospital functions following the 2010 Chilean earthquake.

    • Thomas D Kirsch, Judith Mitrani-Reiser, Richard Bissell, Lauren M Sauer, Michael Mahoney, William T Holmes, Nicolás Santa Cruz, and Francisco de la Maza.
    • School of Public Health, Johns Hopkins University, Baltimore, MD 21209, USA.
    • Disaster Med Public Health Prep. 2010 Jun 1; 4 (2): 122-8.

    ObjectiveThe objective of this study was to assess the impact of the 2010 Chilean earthquake on hospital functions and services. Hospitals functioning in a post-disaster environment must provide emergency medical care related to the event, in addition to providing standard community health services. This study focused on damage to both structural and nonstructural components, as well as to utility services.MethodsSite visits were made to every hospital in a single province (Bio-Bio). Engineers conducted damage assessments while interviews of hospital administrators were conducted. The survey was requested by the Chilean Ministry of Health (MOH) to assess the impact of the earthquake on hospital operations and facility responses to those effects. Other important regional and hospital data were gathered from hospital administrators and the MOH.ResultsSeven government hospitals were surveyed. All hospitals in the region lost communications, municipal electrical power and water for several days. All reported some physical damage although only one suffered significant structural damage. All lost some functional capacity as a result of the earthquake. The loss of telephones and cellular service was identified as the most difficult problem by administrators. An average of 3 physical areas per hospital lost some degree of functional capacity following the earthquake.ConclusionEven in an earthquake-prone and very well-prepared country such as Chile hospital functions were widely disrupted by the event. The loss of hospital functions can occur even with minimal damage to the physical structure. The loss of communications can impede or halt response efforts at all levels. Hospitals should be prepared to self-sustain following a disaster for 2-3 days regardless of the level of structural damage. Understanding the details of these impacts is essential to hospital preparedness and plans for continuing services after a disaster.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…