-
JBI Database System Rev Implement Rep · Feb 2016
Discharge planning for heart failure patients in a tertiary hospital in Shanghai: a best practice implementation project.
- Yu Chen, Li Zhu, Fei Xu, and Jun Chen.
- 1. School of Nursing, Fudan University, Shanghai, P.R. China2. Zhongshan Hospital, Shanghai, P.R. China3. The Fudan Evidence Based Nursing Center: an Affiliate Center of the Joanna Briggs Institute, Shanghai, P.R. China.
- JBI Database System Rev Implement Rep. 2016 Feb 1; 14 (2): 322-36.
BackgroundHeart failure is a major public health concern which contributes significantly to rising healthcare costs. Comprehensive discharge planning can improve health outcomes and reduce readmission rates which, in turn, can lead to cost savings.ObjectivesThe aim of this project was to promote best practice in the discharge planning of heart failure patients admitted in the coronary care unit of Zhongshan Hospital.MethodsA clinical audit was undertaken using the Joanna Briggs Institute Practical Application of Clinical Evidence System tool. Five audit criteria that represent best practice recommendations for heart failure discharge planning were used. A baseline audit was conducted followed by the implementation of multiple strategies, and the project was finalized with a follow-up audit to determine change in practice.ResultsImprovements in practice were observed for all five criteria. The most significant improvements were in the following: completion of a discharge checklist (from 0% to 100% compliance), comprehensive (i.e. inclusion of six topics for self-care) discharge education for patients (from 7% to 100% compliance), and conducting a telephone follow-up (from 0% to 76% compliance). The compliance rates for the two remaining criteria, completion of a structured education for patients and scheduling an outpatient clinic visit, both increased from 93% to 100%.Strategies that were implemented to achieve change in practice included development of a local discharge planning checklist, provision of training for nurses, and development of resources.ConclusionsThe project demonstrated positive changes in the discharge planning practices of nurses in the coronary care unit of Zhongshan Hospital. A formalized discharge planning is currently in place and plans for sustaining practice change are underway. A continuous cycle of audit and re-audit will need to be carried out in the future to determine the impact of this evidence implementation activity on heart failure patient outcomes.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:
![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.