- ED Manag. 2012 Jul 1; 24 (7): 79-81.
AbstractAdministrators at LifePoint Hospitals, based in Brentwood, TN, used lean manufacturing techniques to slash wait times by as much as 30 minutes and achieve double-digit increases in patient satisfaction scores in the EDs at three hospitals. In each case, front-line workers took the lead on identifying opportunities for improvement and redesigning the patient-flow process. As a result of the new efficiencies, patient volume is up by about 25% at all three hospitals. At each hospital, the improvement process began with Kaizen, a lean process that involves bringing personnel together to flow-chart the current system, identify problem areas, and redesign the process. Improvement teams found big opportunities for improvement at the front end of the flow process. Key to the approach was having a plan up front to deal with non-compliance. To sustain improvements, administrators gather and disseminate key metrics on a daily basis.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:
![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.