-
- Mary C Meyer, Robert P Mooney, and Anna K Sekera.
- Department of Emergency Medicine, Kaiser Permanente Medical Center, Walnut Creek, CA 94696, USA. marycmeyer@hotmail.com
- Ann Emerg Med. 2006 May 1;47(5):427-35.
Study ObjectiveWe evaluate the safety and feasibility of a critical care pathway protocol in which patients with acute chest pain who are low risk for coronary artery disease and short-term adverse cardiac outcomes receive outpatient stress testing within 72 hours of an emergency department (ED) visit.MethodsWe performed an observational study of an ED-based chest pain critical pathway in an urban, community hospital in 979 consecutive patients. Patients enrolled in the protocol were observed in the ED before receiving 72-hour outpatient stress testing. The pathway was primarily analyzed for rates of death or myocardial infarction in the 6 months after ED discharge and outpatient stress testing. Secondary outcome measures included need for coronary intervention at initial stress testing and within 6 months after discharge, subsequent ED visits for chest pain, and subsequent hospitalization.ResultsOf 871 stress-tested patients aged 40 years or older, who had low risk for coronary artery disease and short-term adverse cardiac events, and had 6-month follow-up, 18 (2%) required coronary intervention, 1 (0.1%) had a myocardial infarction within 1 month, 2 (0.2%) had a myocardial infarction within 6 months, 6 (0.7%) had normal stress test results after discharge but required cardiac catheterization within 6 months, and 5 (0.6%) returned to the ED within 6 months for ongoing chest pain. Hospital admission rates decreased significantly from 31.2% to 26.1% after initiation of the protocol (P<.001).ConclusionFor patients with chest pain and low risk for short-term cardiac events, outpatient stress testing is feasible, safe, and associated with decreased hospital admission rates. With an evidence-based protocol, physicians efficiently identify patients at low risk for clinically significant coronary artery disease and short-term adverse cardiac outcomes.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.