• Am J Manag Care · Feb 1999

    Critical pathways for postoperative care after simple congenital heart surgery.

    • M B Price, A Jones, J A Hawkins, E C McGough, L Lambert, and J M Dean.
    • Primary Childrens' Medical Center, Salt Lake City, UT, USA. pcmpric2@ihc.com
    • Am J Manag Care. 1999 Feb 1;5(2):185-92.

    ObjectiveTo evaluate the clinical, financial, and parent/patient satisfaction impact of critical pathways on the postoperative care of pediatric cardiothoracic patients with simple congenital heart lesions.Study DesignCritical pathways were developed by pediatric intensive care nurses and implemented under the direction of pediatric cardiothoracic surgeons.Patients And MethodsCritical pathways were used during a 12-month study on 46 postoperative patients with simple repair of atrial septal defect (ASD), coarctation of the aorta (CoA), and patent ductus arteriosus (PDA). Using the study criteria, a control group of 58 patients was chosen from 1993. Prospective and control group data collected included postoperative intubation time, total laboratory tests, arterial blood gas utilization, morphine utilization, time in the pediatric intensive care unit, total hospital stay, total hospital charges, total hospital cost, and complications. Variances from the critical pathway and satisfaction data were also recorded for study patients.ResultsResource utilization was reduced after implementation of critical pathways. Significant reductions were seen in total hours in the pediatric intensive care unit, total number of laboratory tests, postoperative intubation times, arterial blood gas utilization, morphine utilization, length of hospitalization (ASD, 4.9 to 3.1 days; CoA, 5.2 to 3.2 days; and PDA, 4.1 to 1.4 days; all P < 0.05), total hospital charges (ASD, $16,633 to $13,627; CoA, $14,292 to $8319; and PDA, $8249 to $4216; all P < 0.05), and total hospital costs. There was no increase in respiratory complications or other complications. Patients and families were generally satisfied with their hospital experience, including analgesia and length of hospitalization.ConclusionsImplementation of critical pathways reduced resource utilization and costs after repair of three simple congenital heart lesions, without obvious complications or patient dissatisfaction.

      Pubmed     Free full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

Want more great medical articles?

Keep up to date with a free trial of metajournal, personalized for your practice.
1,694,794 articles already indexed!

We guarantee your privacy. Your email address will not be shared.