• Am J Emerg Med · Sep 2022

    Observational Study

    Decline in U.S. Emergency Department admission rates driven by critical pathway conditions, 2006-2014.

    • Michelle P Lin, Olesya Baker, Lynne D Richardson, and Jeremiah D Schuur.
    • Department of Emergency Medicine, Icahn School of Medicine at Mount Sinai, New York, NY, United States of America; Department of Population Health Science and Policy, Icahn School of Medicine at Mount Sinai, New York, NY, United States of America; Institute for Health Equity Research, Icahn School of Medicine at Mount Sinai, New York, NY, United States of America. Electronic address: michelle.lin@mountsinai.org.
    • Am J Emerg Med. 2022 Sep 1; 59: 949994-99.

    ObjectivesDespite increasing ED visits, evidence suggests overall hospitalization rates have decreased; however, it is unknown what clinical conditions account for these changes. We aim to describe condition-specific trends and hospital-level variation in hospitalization rates after ED visits from 2006 to 2014.MethodsRetrospective observational study of adult ED visits to U.S. acute care hospitals using nationally weighted data from the 2006-2014 National Emergency Department Survey. Our primary outcome was ED admission rate, defined as the number of admissions originating in the ED divided by the number of ED visits. We report admission rates overall and for each condition, including changes over time. We used logistic regression to compare the odds of ED admission from 2006 to 2014, adjusting for patient and hospital characteristics. We also measured hospital-level variation by calculating hospital-level median ED admission rates and interquartile ranges.ResultsAfter adjusting for patient and hospital characteristics, the odds of ED admission for any condition were 0.49 (CI 0.45, 0.52) in 2014 compared to 2006. The conditions with the greatest relative change in ED admission rates were chest pain (21.7 to 7.5%) and syncope (28.9 to 13.8%). The decline in ED admission rates were accompanied by increased variation in hospital-level ED admission rates.ConclusionsRecent reductions in ED admissions are largely attributable to decreased admissions for conditions amenable to outpatient critical pathways. Focusing on hospitals with persistently above-average ED admission rates may be a promising approach to improve the value of acute care.Copyright © 2022 Elsevier Inc. All rights reserved.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…