-
- Philip Lebowitz.
- Moses Division, Montefiore Medical Center, New York, USA.
- AORN J. 2003 Oct 1;78(4):651-4, 657-9.
AbstractOPERATING ROOM MANAGERS are hampered in their efforts to optimize OR efficiency by surgical procedures that last a longer or shorter time than scheduled. The lack of predictability is a result of inaccuracy in scheduling and variability in the duration of procedures. SCHEDULING SHORT PROCEDURES before long procedures theoretically limits this variability. MONTE CARLO SIMULATION of ORs scheduled with various combinations of short and long procedures supports this concept's validity. RESULTS INDICATE that scheduling short procedures first can improve on-time performance and decrease staff member overtime expense without reducing surgical throughput.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:
![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.