• Yonsei medical journal · May 2016

    Observational Study

    Outcomes before and after the Implementation of a Critical Pathway for Patients with Acute Aortic Disease.

    • Kyu Chul Shin, Hye Sun Lee, Joon Min Park, Hyun-Chel Joo, Young-Guk Ko, Incheol Park, and Min Joung Kim.
    • Department of Emergency Medicine, Yonsei University College of Medicine, Seoul, Korea.
    • Yonsei Med. J. 2016 May 1; 57 (3): 626634626-34.

    PurposeAcute aortic diseases, such as aortic dissection and aortic aneurysm, can be life-threatening vascular conditions. In this study, we compared outcomes before and after the implementation of a critical pathway (CP) for patients with acute aortic disease at the emergency department (ED).Materials And MethodsThis was a retrospective observational cohort study. The CP was composed of two phases: PRE-AORTA for early diagnosis and AORTA for prompt treatment. We compared patients who were diagnosed with acute aortic disease between pre-period (January 2010 to December 2011) and post-period (July 2012 to June 2014).ResultsNinety-four and 104 patients were diagnosed with acute aortic disease in the pre- and post-periods, respectively. After the implementation of the CP, 38.7% of acute aortic disease cases were diagnosed via PRE-AORTA. The door-to-CT time was reduced more in PRE-AORTA-activated patients [71.0 (61.0, 115.0) min vs. 113.0 (56.0, 170.5) min; p=0.026]. During the post-period, more patients received emergency intervention than during the pre-period (22.3% vs. 36.5%; p=0.029). Time until emergency intervention was reduced in patients, who visited the ED directly, from 378.0 (302.0, 489.0) min in the pre-period to 200.0 (170.0, 299.0) min in the post-period (p=0.001). The number of patients who died in the ED declined from 11 to 4 from the pre-period to the post-period. Hospital mortality decreased from 26.6% to 14.4% in the post-period (p=0.033).ConclusionAfter the implementation of a CP for patients with acute aortic disease, more patients received emergency intervention within a shorter time, resulting in improved hospital mortality.

      Pubmed     Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…