-
- S Noyan Ogulata and Rizvan Erol.
- Department of Industrial Engineering, Cukurova University, Adana, Turkey. noyan@cu.edu.tr
- J Med Syst. 2003 Jun 1;27(3):259-70.
AbstractLimited staff and equipment within surgical services require efficient use of these resources among multiple surgeon groups. In this study, a set of hierarchical multiple criteria mathematical programming models are developed to generate weekly operating room schedules. The goals considered in these models are maximum utilization of operating room capacity, balanced distribution of operations among surgeon groups in terms of operation days, lengths of operation times, and minimization of patient waiting times. Because of computational difficulty of this scheduling problem, the overall problem is broken down into manageable hierarchical stages: (1) selection of patients, (2) assignment of operations to surgeon groups, and (3) determination of operation dates and operating rooms. Developed models are tested on the data collected in College of Medicine Research Hospital at Cukurova University as well as on simulated data sets using MPL optimization package.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:
![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.