• Best Pract Benchmarking Healthc · Jan 1996

    Cost containment in cardiac surgery: results with a critical pathway for coronary bypass surgery at the New York hospital-Cornell Medical Center.

    • F T Velasco, W Ko, T Rosengart, N Altorki, S Lang, J P Gold, K H Krieger, and O W Isom.
    • Department of Cardiothoracic Surgery, New York Hospital-Cornell University Medical College, New York City 10021, USA.
    • Best Pract Benchmarking Healthc. 1996 Jan 1;1(1):21-8.

    PurposeA multidisciplinary project was undertaken at The New York Hospital-Cornell Medical Center to develop critical pathways for open-heart surgery to help reduce cost, shorten hospital length of stay (LOS), and streamline patient care.MethodsA critical pathway for elective coronary artery bypass grafting instituted on March 1, 1995, was developed through a cooperative effort involving surgeons, anesthesiologists, nurses, social workers, physical therapists, nutritionists, and patient case managers. Prospective data collected on consecutive patients forming a critical pathway group (n = 114) over a 6-month period were compared with retrospective data on consecutive patients forming a cohort group (n = 382) who underwent elective coronary artery bypass grafting in 1994.ResultsThe critical pathway group of patients experienced a significantly shorter total hospital LOS (7.7 +/- 2.3 days vs 11.1 +/- 6 days, p < 0.0001) and shorter intensive care unit LOS (1.5 +/- 0.9 days vs 2.0 +/- 2.8 days, p < 0.0001). Direct costs were computed by use of hospital charges multiplied by the Medicare cost-to-charge ratio. Mean hospital direct cost (ancillary resources) was $1181 lower in the critical pathway group when compared with the control group (p < 0.0001). The postoperative mortality and readmission rates were similar for the two groups of patients.ConclusionsThe ongoing analysis of cost, LOSs, and outcomes has made possible a process of continuous quality improvement on the cardiothoracic service in which further areas for improvement are identified and studied. The use of a critical pathway for elective coronary artery bypass grafting at our institution significantly reduced hospital LOS and direct costs while maintaining the overall quality of patient care.

      Pubmed     Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

What will the 'Medical Journal of You' look like?

Start your free 21 day trial now.

We guarantee your privacy. Your email address will not be shared.