• J. Surg. Res. · Mar 2012

    Hemodilution is not critical in the pathogenesis of the acute coagulopathy of trauma.

    • Max Valentin Wohlauer, Ernest E Moore, Nathan M Droz, Jeffrey Harr, Eduardo Gonzalez, Miguel Fragoso, and Christopher C Silliman.
    • Department of Surgery, University of Colorado Denver, Denver, Colorado, USA.
    • J. Surg. Res. 2012 Mar 1;173(1):26-30.

    BackgroundThe acute coagulopathy of trauma is multifactorial, but generally believed to be aggravated by coexisting acidosis, hypothermia, and hemodilution. While acidosis and hypothermia have been extensively evaluated, there is a paucity of data on the independent role of hemodilution in this scenario. We therefore hypothesized that hemodilution will impair coagulation following experimental trauma and hemorrhagic shock.MethodsAdult male Spraque-Dawley rats underwent trauma and hemorrhagic shock, followed by resuscitation with 2 × SBV using normal saline (NS). Thrombelastography (TEG) was performed before and after shock.ResultsIn this trauma model, resuscitation resulted in a hemodilution of 50% (43% ± 4.05% versus 19.8% ± 3.96% Hct pre-shock versus post-shock , P < 0.0001). Despite the substantial hemodilution, there was no significant change in clot strength (12.96 ± 2.84 versus 11.79 ± 1.28 dynes/cm(2) G pre-shock versus post-shock, P = 0.13). Similarly, the onset of coagulation (R time) was not impaired (1.68 ± 1.74 s versus 1.75 ± 0.63 s R time pre-shock versus post-shock, P = 0.45).ConclusionIn the absence of hypothermia and acidosis, hemodilution (≤ 50%) has a trivial effect on coagulation following trauma and hemorrhagic shock. These data call to question the commonly held belief that hemodilution per se is critical in the development of post-injury coagulopathy.Copyright © 2012 Elsevier Inc. All rights reserved.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…