• Acad Emerg Med · Jun 2011

    Critical pathways for post-emergency outpatient diagnosis and treatment: tools to improve the value of emergency care.

    • Jeremiah D Schuur, Christopher W Baugh, Erik P Hess, Joshua A Hilton, Jesse M Pines, and Brent R Asplin.
    • Department of Emergency Medicine, Brigham and Women's Hospital, Boston, MA, USA. jschuur@partners.org
    • Acad Emerg Med. 2011 Jun 1;18(6):e52-63.

    AbstractThe decision to admit a patient to the hospital after an emergency department (ED) visit is expensive, frequently not evidence-based, and variable. Outpatient critical pathways are a promising approach to reduce hospital admission after emergency care. Critical pathways exist to risk stratify patients for potentially serious diagnoses (e.g., acute myocardial infarction [AMI]) or evaluate response to therapy (e.g., community-acquired pneumonia) within a short time period (i.e., less than 36 hours), to determine if further hospital-based acute care is needed. Yet, such pathways are variably used while many patients are admitted for conditions for which they could be treated as outpatients. In this article, the authors propose a model of post-ED critical pathways, describe their role in emergency care, list common diagnoses that are amenable to critical pathways in the outpatient setting, and propose a research agenda to address barriers and solutions to increase the use of outpatient critical pathways. If emergency providers are to routinely conduct rapid evaluations in outpatient or observation settings, they must have several conditions at their disposal: 1) evidence-based tools to accurately risk stratify patients for protocolized care, 2) systems of care that reliably facilitate workup in the outpatient setting, and 3) a medical environment conducive to noninpatient pathways, with aligned risks and incentives among patients, providers, and payers. Increased use of critical pathways after emergency care is a potential way to improve the value of emergency care.© 2011 by the Society for Academic Emergency Medicine.

      Pubmed     Free full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…