• Anesthesia and analgesia · Jun 2013

    A behavioral study of daily mean turnover times and first case of the day start tardiness.

    • Jihan Wang, Franklin Dexter, and Kai Yang.
    • Division of Management Consulting, Department of Anesthesia, University of Iowa, 200 Hawkins Dr., Iowa City, IA 52242, USA.
    • Anesth. Analg. 2013 Jun 1; 116 (6): 1333-41.

    BackgroundPrevious research has identified 2 psychological biases in operating room (OR) decisions on the day of surgery: risk attitude of the decision-maker at the OR control desk and decisions made by OR staff to increase clinical work per unit time during the hours they are assigned. Resulting decisions are worse than random chance at reducing overutilized time. To isolate the second bias from decisions at the OR control desk, previous studies of the second bias have analyzed decisions made in non-OR locations and on nights/weekends. Another way to isolate the second bias from decisions at the OR control desk is to study facilities with negligible overutilized OR time. We examined the second bias using data from such a facility.MethodsOne year of data was collected from a 5-OR hospital. Allocated OR time that minimized the inefficiency of use of OR time was determined first to confirm there was virtually no overutilized OR time. A structural equation model was then built to evaluate the relations among variables while controlling for other correlations. We tested the hypothesis that nonoperative times were no longer on days with little versus relatively large workload.ResultsThe extra ORs were not cost efficient (i.e., the mean potential improvement varied among days from 21.1% ± 0.2% [SE] to 38.9% ± 0.2%), resulting in very little overutilized OR time. However, conditioned on the preceding tactical decision of running extra ORs, the allocated OR time during the studied period was that which minimized the inefficiency of use of OR time. As the preceding results showed that the facility was suitable for the behavioral study, the behavioral study was performed, and the hypothesized relation confirmed. Each 1-hour decrease in the daily estimated (total) duration of elective cases resulted in a managerially unimportant decrease in the mean turnover times (0.41 ± 0.21 minutes, P = 0.053). Excluding turnovers when there were >2 turnovers occurring simultaneously, there was no significant decrease (0.17 ± 0.24 minutes, P = 0.464) in the mean turnover times per each 1-hour decrease in the daily estimated (total) duration. Similarly, after excluding prolonged turnovers (>60 minutes), there was no significant decrease (0.16 ± 0.16 minutes, P = 0.315) in the mean turnover times per each 1-hour decrease in the daily estimated (total) duration.ConclusionsPrevious experimental and observational studies found many clinicians maintained high clinical work per unit time during the hours to which they were assigned. We tested and confirmed a prediction of this bias as was applied during regularly scheduled OR hours among an entire surgical team. Overall, the staff worked just as quickly on days with few or many hours of cases. The OR staff did not slow down, thus filling the time. These results have important implications for the cost utility of information technologies to facilitate managerial decision-making on the day of surgery.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…