• J. Am. Coll. Surg. · May 2011

    Implementation of a critical pathway for complicated gallstone disease: translation of population-based data into clinical practice.

    • Kristin M Sheffield, Kenia E Ramos, Clarisse D Djukom, Carlos J Jimenez, William J Mileski, Thomas D Kimbrough, Courtney M Townsend, and Taylor S Riall.
    • Department of Surgery, The University of Texas Medical Branch, Galveston, TX, USA. kmsheffi@utmb.edu
    • J. Am. Coll. Surg. 2011 May 1;212(5):835-43.

    BackgroundEvidence-based guidelines recommend cholecystectomy during initial hospitalization for complicated gallstone disease. Previous studies and quality initiative data from our institution demonstrated that only 40% to 75% of patients underwent cholecystectomy on index admission.Study DesignIn January 2009, we implemented a critical pathway to improve cholecystectomy rates for all patients emergently admitted for acute cholecystitis, mild gallstone pancreatitis, or common bile duct stones. We compared cholecystectomy rates during initial hospitalization, time to cholecystectomy, length of initial stay, and readmission rates in prepathway (January 2005 to February 2008) and postpathway patients (January 2009 to May 2010).ResultsDemographic and clinical characteristics were similar between prepathway (n = 455) and postpathway patients (n = 112). Cholecystectomy rates during initial hospitalization increased from 48% to 78% after pathway implementation (p < 0.0001). There were no differences in operative mortality or operative complications between the 2 groups. For patients undergoing cholecystectomy on initial hospitalization, the mean length of stay decreased after pathway implementation (7.1 days to 4.5 days; p < 0.0001), primarily due to a decrease in the time from admission to cholecystectomy (4.1 days to 2.1 days; p < 0.0001). Thirty-three percent of prepathway and 10% of postpathway patients required readmission for gallstone-related problems or operative complications (p < 0.0001), and each readmission generated an average of $19,000 in additional charges.ConclusionsImplementation of a multidisciplinary critical pathway improved cholecystectomy rates on initial hospitalization and lowered costs by shortening length of stay and markedly decreasing readmission rates for gallstone-related problems. Broader implementation of similar pathways offers the potential to translate evidence-based guidelines into clinical practice and minimize the cost of medical care.Copyright © 2011 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?

    User can't be blank.

    Content can't be blank.

    Content is too short (minimum is 15 characters).

    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

What will the 'Medical Journal of You' look like?

Start your free 21 day trial now.

We guarantee your privacy. Your email address will not be shared.