• Am. J. Cardiol. · Sep 2001

    Ninety-minute accelerated critical pathway for chest pain evaluation.

    • S M Ng, P Krishnaswamy, R Morissey, P Clopton, R Fitzgerald, and A S Maisel.
    • Department of Medicine, University of California, San Diego, California, USA.
    • Am. J. Cardiol. 2001 Sep 15;88(6):611-7.

    AbstractRapid, efficient, and accurate evaluation of chest pain patients in the emergency department optimizes patient care from public health, economic, and liability perspectives. To evaluate the performance of an accelerated critical pathway for patients with suspected coronary ischemia that utilizes clinical history, electrocardiographic findings, and triple cardiac marker testing (cardiac troponin I [cTnI], myoglobin, and creatine kinase-MB [CK-MB]), we performed an observational study of a chest pain critical pathway in the setting of a large Emergency Department at the Veterans Affairs Medical Center in 1,285 consecutive patients with signs and symptoms of cardiac ischemia. The accelerated critical pathway for chest pain evaluation was analyzed for: (1) accuracy in triaging of patients within 90 minutes of presentation, (2) sensitivity, specificity, positive predictive value, and negative predictive value of cTnI, myoglobin, and CK-MB in diagnosing acute myocardial infarction (MI) within 90 minutes, and (3) impact on Coronary Care Unit (CCU) admissions. All MIs were diagnosed within 90 minutes of presentation (sensitivity 100%, specificity 94%, positive predictive value 47%, negative predictive value 100%). CCU admissions decreased by 40%. Ninety percent of patients with negative cardiac markers and a negative electrocardiogram at 90 minutes were discharged home with 1 patient returning with an MI (0.2%) within the next 30 days. Thus, a simple, inexpensive, yet aggressive critical pathway that utilizes high-risk features from clinical history, electrocardiographic changes, and rapid point-of-care testing of 3 cardiac markers allows for accurate triaging of chest pain patients within 90 minutes of presenting to the emergency department.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…