-
J Psychosoc Nurs Men · Jul 1994
Promoting quality mental health care delivery with critical path care plans.
- J Dunn, D Rodriguez, and J J Novak.
- Mental Health Network, Northwest Community Hospital, Arlington Heights, Illinois.
- J Psychosoc Nurs Men. 1994 Jul 1; 32 (7): 25-9.
Abstract1. Mental Health providers are under increasing pressure to provide objective, individualized care that produces outcomes that may be measured against accepted clinical standards. 2. Clinicians may now track patient responses throughout a continuum of treatment in varying locations by using a customized critical path/treatment plan format. 3. Care delivery is documented by superimposing actual occurrences over desired ones on a critical pathway.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:
![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.