• J. Cardiothorac. Vasc. Anesth. · Feb 2017

    Surgery Start Time Does Not Impact Outcome in Elective Cardiac Surgery.

    • Joshua A Heller, Rishi Kothari, Hung-Mo Lin, Matthew A Levin, and Menachem Weiner.
    • Department of Anesthesiology, Icahn School of Medicine at Mount Sinai, New York, NY. Electronic address: Joshua.heller@mountsinai.org.
    • J. Cardiothorac. Vasc. Anesth. 2017 Feb 1; 31 (1): 32-36.

    ObjectiveDetermine if surgery start time impacts patient outcomes in elective cardiac surgery.DesignThis was a retrospective study.SettingThis study was based at a single academic institution.ParticipantsPatients undergoing elective cardiac surgery over a 3-year period were included.InterventionsThere were no interventions.Measurements And Main ResultsThe authors performed a retrospective study of patients undergoing elective cardiac surgery over a 3-year period. They divided their patient groups into those who had an anesthesia start time between 6:00 a.m. and 4:00 p.m. and those who had an anesthesia start time between 4:01 p.m. and 5:59 a.m. In the original sample and propensity-score-matched groups, the authors examined the effects of start time on morbidity, mortality, and several metrics of hospital length of stay. The start time of elective cardiac surgery did not have a statistically significant effect upon mortality, individual or composite morbidity, or hospital length of stay in either the original sample or the propensity-score-matched sample.ConclusionsThe authors' results suggested that elective cardiac surgery may be performed late at night without adverse effects, although institutional support for this effort (such as 24-hour intensivist coverage to facilitate fast-track extubation) may have been integral to their findings.Copyright © 2017 Elsevier Inc. All rights reserved.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

Want more great medical articles?

Keep up to date with a free trial of metajournal, personalized for your practice.
1,694,794 articles already indexed!

We guarantee your privacy. Your email address will not be shared.