-
- T Ciorra.
- C.S. Project Consultants, England.
- World Hosp. 1993 Jan 1; 29 (2): 25-9.
AbstractFeasibility studies to establish the reality of planning, designing and building a major new (650-bed) general teaching hospital on a restricted urban site in a time-scale of five years--instead of the more usual time-scale of twelve or more years for a similar UK National Health Service building--commenced almost six years ago. These studies constituted the groundwork for the birth of the new Chelsea and Westminster Hospital. This article discusses the process and time span of the commissioning and occupation of this new hospital, and deals specifically with the problems encountered.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:
![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.