• Health Qual Life Out · Jun 2018

    Assessing health status over time: impact of recall period and anchor question on the minimal clinically important difference of copd health status tools.

    • H J Alma, C de Jong, D Jelusic, M Wittmann, M Schuler, B J Kollen, R Sanderman, K Schultz, J W H Kocks, and T Van der Molen.
    • University of Groningen, University Medical Center Groningen, Department of General Practice and Elderly Care Medicine, HPC FA21, Postbox 196, NL-9700, AD, Groningen, The Netherlands. h.j.alma@umcg.nl.
    • Health Qual Life Out. 2018 Jun 26; 16 (1): 130.

    BackgroundThe Minimal Clinically Important Difference (MCID) assesses what change on a measurement tool can be considered minimal clinically relevant. Although the recall period can influence questionnaire scores, it is unclear if it influences the MCID. This study is the first to examine longitudinally the impact of the recall period of an anchor question and its design on the MCID of COPD health status tools using the COPD Assessment Test (CAT), Clinical COPD Questionnaire (CCQ) and the St. George's Respiratory Questionnaire (SGRQ).MethodsModerate to very severe COPD patients without respiratory co-morbidities were recruited during 3-week Pulmonary Rehabilitation (PR). CAT, CCQ and SGRQ were completed at baseline, discharge, 3, 6, 9 and 12 months. A 15-point Global Rating of Change scale (GRC) was completed at each follow-up. A five-point GRC was used as second anchor at 12 months. Mean change scores of a subset of patients indicating a minimal improvement on each of the anchor questions were considered the MCID. The MCID estimates over different time periods were compared with one another by evaluating the degree of overlap of Confidence Intervals (CI) adjusted for dependency.ResultsIn total 451 patients were included (57.9 ± 6.6 years, 65% male, 50/39/11% GOLD II/III/IV), of which 309 completed follow-up. Baseline health status scores were 20.2 ± 7.3 (CAT), 2.9 ± 1.2 (CCQ) and 50.7 ± 17.3 (SGRQ). MCID estimates for improvement ranged - 3.1 to - 1.4 for CAT, - 0.6 to - 0.3 for CCQ, and - 10.3 to - 7.6 for SGRQ. Absolute higher - though not significant - MCIDs were observed for CAT and CCQ directly after PR. Significantly absolute lower MCID estimates were observed for CAT (difference - 1.4: CI -2.3 to - 0.5) and CCQ (difference - 0.2: CI -0.3 to -0.1) using a five-point GRC.ConclusionsThe recall period of a 15-point anchor question seemed to have limited impact on the MCID for improvement of CAT, CCQ and SGRQ during PR; although a 3-week MCID estimate directly after PR might lead to absolute higher values. However, the design of the anchor question was likely to influence the MCID of CAT and CCQ.Trial RegistrationRIMTCORE trial # DRKS00004609 and #12107 (Ethik-Kommission der Bayerischen Landesärztekammer).

      Pubmed     Free full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…