• Intensive care medicine · Jun 2001

    Assessing the effectiveness of critical pathways on reducing resource utilization in the surgical intensive care unit.

    • S Berenholtz, P Pronovost, P Lipsett, P Dawson, and T Dorman.
    • Department of Anesthesiology/Critical Care Medicine, Johns Hopkins University School of Medicine, Baltimore, MD 21287-5842, USA. sberenho@jhmi.edu
    • Intensive Care Med. 2001 Jun 1;27(6):1029-36.

    ObjectivesTo evaluate the effectiveness of procedure-specific surgical critical pathways on reducing resource utilization in a university surgical intensive care unit (ICU).Design And SettingProspective cohort study in a university surgical ICU.Patients194 patients, accounting for 255 patient days, sampled on randomly selected days over a 12-month period of time.Measurements And ResultsThe primary outcomes of this study were pathway eligibility and laboratory utilization. Patients were eligible for a procedure-specific pathway in 34% of patient days identified, and the patient's clinical course was "on" pathway in 22% of patient days. Of those "on" the pathway, 54% had a pathway present in the chart and 32% of these included documentation of the patient's clinical course. Thus in 78% of the patient days the patient was either not eligible for a critical pathway or the patient's clinical course was "off" pathway. In those patients "on" the pathway 46 % did not have a pathway present in the chart. Being on a critical pathway did not reduce laboratory utilization. Laboratory utilization did not vary between patients "on" and "off" the pathway (19.1 +/- 11.3 laboratory tests/patient day versus 20.4 +/- 5.7 laboratory tests/patient day). Predicted laboratory utilization by the pathway was 5.6 laboratory tests/patient day. By reducing actual laboratory utilization to that predicted by the critical pathway we would reduce laboratory utilization at our institution by $1.2 million per year.ConclusionsProcedure-specific surgical critical pathways are not an effective tool for reducing resource utilization in our ICU. Most of our patients were not eligible for an available pathway, and those who were eligible and were "on" the pathway did not appear to have laboratory utilization guided by the pathway. Future initiatives need to explore other means such as ICU-specific care processes to reduce resource utilization in the ICU.

      Pubmed     Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

What will the 'Medical Journal of You' look like?

Start your free 21 day trial now.

We guarantee your privacy. Your email address will not be shared.